Bareilly Club Limited Commercial Swimming Pool Project Details
Home / Projects / Bareilly Club Limited Commercial Swimming Pool Project Details
Bareilly Club Limited
Project Overview
DS Water Technology is an expert aquatic engineering firm and specialized manufacturing contractor tasked with delivering full-scale modernization, leak retrofitting, and high-performance equipment overhauls for heritage social hubs like Bareilly Club Limited. Catering to a large community of over 2,600 elite military and civil service members, the club's recreational amenities undergo constant usage. DS Water Technology executed a comprehensive structural and technical update of the legacy pool layout, substituting outdated plumbing loops with modern high-efficiency skimmer systems, durable tiling, and automated water management to restore structural longevity and preserve crystal-clear water purity.
Client Location
Corporate Entity & Administrative Presence: Administered by an elected Board of Directors with central administrative facilities located at the main club campus in Bareilly, Uttar Pradesh, India.
Project Location
Physical Project Execution Sites: Complete aquatic structural overhauls and filtration modernizations executed on-site at Bareilly Club Limited (Plot Number 1, Civil Lines, Near Ganga Charan Hospital, Bareilly, Uttar Pradesh 243001).
Project Scope & Installed Systems
Legacy Plumbing & Structural Retrofitting: Comprehensive tile retrofitting, structural concrete crack sealing, and complete pipeline pressure testing to eliminate leaks within the legacy civil pool shell.
High-Rate Skimmer Filtration Systems: Removal of outdated water recycling setups and integration of modern pool surface skimmers alongside high-efficiency pressure sand filter tanks for continuous clearing of floating debris.
Elite Deck Aesthetics & Furnishings: Supply of durable, anti-slip pool overflow drainage gratings, premium internal glass mosaic tiling, and commercial-grade poolside lounge deck chairs for member relaxation.
Balanced Chemical Sanitation: Implementation of optimized chemical distribution configurations using inline dosing loops and high-purity TCCA 90 chlorine treatment to protect large member families from organic contamination.
Project Timeline, Cost Estimations, and Execution Specifications
Project Parameter
Commercial Execution Details (Bareilly Club Specifications)
Time Duration Took
3 to 5 months (Includes meticulous leak testing, deep plumbing layout adjustments, and premium tile masonry timelines).
Project Price / Cost Range
₹15 Lakhs to ₹35 Lakhs+ INR (Varies based on the condition of the existing legacy concrete shell, chosen high-grade mosaic patterns, and total pool capacity parameters).
Service Standard
Turnkey commercial modernization encompassing full structural repair, mechanical engineering upgrades, testing, fluid balancing, and ongoing Annual Maintenance Contracts (AMC).
Strategic Execution Excellence
By using their direct in-house manufacturing lines to build core filtration tanks, high-pressure circulation pumps, and perimeter safety accessories, DS Water Technology eliminates middleman delays and third-party supplier logistics. This integrated operational framework provides heritage private clubs with single-source engineering accountability, ensuring that vital social infrastructure projects are delivered on budget and meet strict municipal sanitation codes without operational downtime.
GET IN TOUCH
Ready to build or
upgrade your pool?
Tell us about your swimming pool project and one of our
experts will contact you within 24 hours with the best
solution and pricing.
Dharmendra SinghProprietor
126, Mange Ram Park, Rohini,
New Delhi - 110086, Delhi, India