Moradabad Club Commercial Swimming Pool Project Details
Home / Projects / Moradabad Club Commercial Swimming Pool Project Details
Moradabad Club
Project Overview
DS Water Technology is an expert aquatic engineering enterprise and specialized manufacturing contractor responsible for executing full-scale structural modernization, leakage retrofitting, and high-efficiency filtration upgrades for premier elite social centers like the Moradabad Club. Serving as a central recreational hub for high-profile regional members, the club’s legacy pool facility demanded an update to handle daily multi-user swimming demands while lowering water wastage. DS Water Technology successfully replaced obsolete plumbing networks with modern, continuous-turnover water circulation setups, premium internal mosaic tiling, and localized sanitization controls to combine modern luxury with structural durability.
Client Location
Corporate Entity & Administrative Presence: Managed under an active executive sports and administrative committee based within the central club estate in Moradabad, Uttar Pradesh, India.
Project Location
Physical Project Execution Sites: On-site commercial pool modernization and deck aesthetic overhauls delivered directly at Moradabad Club (Civil Lines, near District Magistrate Court Area, Moradabad, Uttar Pradesh 244001).
Project Scope & Installed Systems
Structural Shell Restoration & Grouting: Strategic sealing of legacy concrete micro-cracks, application of multi-layer flexible waterproofing, and complete high-pressure plumbing line checks to permanently prevent underground water leakage.
High-Performance Skimmer Filtration Loop: Sourcing and placement of modern pool surface skimmers combined with high-capacity pressure sand filter tanks to ensure uniform, continuous filtration of environmental debris.
Hygienic Water Chemical Dosing: Setup of precise inline chemical distribution loops utilizing premium TCCA 90 chlorine regulators to ensure stable pH balancing and deep sanitization for member families.
Premium Member Deck Accessories: Outfitting the pool perimeter with anti-slip overflow drain gratings, heavy-wall ergonomic stainless steel ladders, and commercial-grade poolside lounger chairs optimized for long-term comfort.
Project Timeline, Cost Estimations, and Execution Specifications
Project Parameter
Commercial Execution Details (Moradabad Club Benchmarks)
Time Duration Took
3 to 5 months (Accounts for meticulous leak-detection analysis, legacy pipe replacement, and high-precision tile masonry).
Project Price / Cost Range
₹14 Lakhs to ₹32 Lakhs+ INR (Varies based on total volumetric pool dimensions, degree of sub-surface wear, and choice of custom finishing mosaics).
Service Standard
Turnkey commercial remodeling including civil shell fortification, mechanical engineering deployment, hydraulic pressure testing, and ongoing Annual Maintenance Contracts (AMC).
Strategic Execution Excellence
By running all core equipment through an in-house manufacturing pipeline, DS Water Technology eliminates middleman delays and third-party supplier logistics. This centralized delivery model provides historic private clubs with single-source engineering accountability. It ensures that vital social infrastructure projects are delivered on budget, meet all regional health department criteria, and operate trouble-free across long peak seasonal cycles.
GET IN TOUCH
Ready to build or
upgrade your pool?
Tell us about your swimming pool project and one of our
experts will contact you within 24 hours with the best
solution and pricing.
Dharmendra SinghProprietor
126, Mange Ram Park, Rohini,
New Delhi - 110086, Delhi, India