Red Oak Eco-Resort Commercial Swimming Pool Project Details
Home / Projects / Red Oak Eco-Resort Commercial Swimming Pool Project Details
Red Oak Resort
Project Overview
DS Water Technology is a premier aquatic engineering firm and equipment manufacturer specialized in constructing highly aesthetic, naturalistic swimming pools and interactive water features for experiential eco-resorts and retreat properties like Red Oak. Moving away from stark, traditional rectangular configurations, DS Water Technology implements custom pool architecture that integrates directly with natural landscapes. Their solutions combine advanced under-surface skimmer systems with therapeutic water components, creating a peaceful, high-end wellness environment that handles heavy guest occupancy while preserving a rustic resort aesthetic.
Client Location
Corporate Entity Presence: Operating under its centralized leisure and retreat management group with administrative divisions based in the Delhi-NCR region, India.
Project Location
Physical Project Execution Sites: Turnkey outdoor pool installation and premium landscape integration executed on-site at the main Red Oak Resort & Retreat grounds (located within the prominent eco-stay and weekend getaway corridor of the Delhi-NCR perimeter).
Project Scope & Installed Systems
Naturalistic Pool Engineering & Carpentry: Complete civil construction of custom-shaped outdoor pool shells paired with specialized multi-layer flexible waterproofing to safeguard integrated rock structures.
High-Rate Skimmer Filtration Loops: Placement of discrete, low-noise surface skimmers and high-efficiency pressure sand filter tanks engineered to continuously clear falling organic debris and leaves common to outdoor eco-resorts.
Therapeutic Hydrotherapy Zones: Development of a dedicated wellness corner outfitted with therapeutic Jacuzzi air-jets, inline water heating networks, and customized underwater seating fittings.
Decorative Rock Fountains & Ambiance: Sourcing and plumbing of customized rock fountains, programmatic water nozzles, and low-voltage, synchronized waterproof LED lighting networks to enhance evening resort vibes.
Project Timeline, Cost Estimations, and Execution Specifications
Project Parameter
Commercial Execution Details (Red Oak Resort Benchmarks)
Time Duration Took
3.5 to 5.5 months (Includes landscape molding, extensive civil waterproofing cycles, and custom decorative rock fountain placement).
Project Price / Cost Range
₹16 Lakhs to ₹38 Lakhs+ INR (Highly dependent on custom shape contours, total volumetric water capacity, and chosen hydrotherapy integrations).
Service Standard
Turnkey commercial contracting spanning soil stabilization, civil masonry, mechanical system installation, hydraulic pressure testing, and ongoing Annual Maintenance Contracts (AMC).
Strategic Execution Excellence
By running all core equipment through an in-house manufacturing pipeline, DS Water Technology eliminates middleman delays and third-party supplier logistics. This centralized delivery model provides luxury resort operators with single-source engineering accountability. It ensures that campus swimming and wellness facilities are constructed strictly on schedule, meet all regional health department criteria, and operate trouble-free across long peak holiday seasons.
GET IN TOUCH
Ready to build or
upgrade your pool?
Tell us about your swimming pool project and one of our
experts will contact you within 24 hours with the best
solution and pricing.
Dharmendra SinghProprietor
126, Mange Ram Park, Rohini,
New Delhi - 110086, Delhi, India